PROJECT | CLIENT | STATUS | PROGRAM |
Arbor Row Tysons, VA |
Cityline Partners |
Master Plan for 2.5 million square feet on a 31.38 acre property. Site includes office, residential and hotel high-rise buildings, with extensive greenspaces. |
|
Arlington Gateway Mixed Use Development Arlington, VA |
The JBG Companies | Completed 2006 |
1.2 million-sf mixed-use development, including a 320,000-sf office building, 416-unit apartment building, 336-key Westin hotel, and a 237-unit boutique condo building. |
Crystal City Main Street Arlington, VA |
Vornado / Charles E. Smith | Completed 2000 |
175,000-sf urban retail redevelopment. |
Dam Sen Park Ho Chi Minh City, Vietnam |
GP Invest | Plan Completed 2010 |
Located in the largest city in Vietnam, this urban development in Ho Chi Minh City includes five buildings-Buildings A, B, C, D and E-with retail, and office space programs, and over 1000 residential units. The development covers 40% of the lot, which has a total construction area of 142,050 m2 (1.5 million gsf). |
Dominion Square - CARS Tysons, VA |
CARS, Perseus, Sunburst |
15-acre, 4.5 million-sf new mixed-use transit-oriented master plan located at the Tysons Spring Hill Metro Station. |
|
Falls Church City Center Falls Church, VA |
Atlantic Realty Companies | Plan Completed 2009 |
5.5-acre mixed use development consisting of a 114,140-sf, 9-story office building with 7,000-sf of retail and a 3,500-sf bank. The site also includes a 9-story, 160-key hotel, a 9-story, 53-unit condominium building, 5,790-sf of retail, a 3,500-sf restaurant, a 43,400-sf, 3-story bowling center, a 6 to 9-story residential building with 500-units, 7,500-sf of retail and a 55,000-sf grocery store.
|
Greensboro Park Place Tysons, VA |
Beacon Capital Partners |
A 485,000 sf mixed-use development with two 20 and 24-story residential towers totaling 480 units, a 2,000 sf retail, 3,000 sf public recreational facility, a 1.5 acres of public parks and a three-level below-grade parking garage. |
|
Imminent Bloom Willets Point, NY |
Metropolis Magazine's Living Cities Design Competition / AIA Unbuilt Design Competition | Completed through Concept Design |
440,000-sf, 40-story residential tower with 96 340-sf micro units,108 1,290-sf expandable loft units, four community spaces spanning the building’s width, and a water treatment and filtration stystem at the base. |
Las Colinas Station Irving, TX |
LMC | Completed 2016 |
4.4-acre master plan and 413,000-sf, 5-story, residential building with 374 units. Construction type IIIA & VA. |
Michigan and Irving Washington, DC |
Conference Center Association | In Progress |
9-story, 336-key hotel; 2-story, 31,500-sf conference center; 14,760-sf of ground-floor retail space; and 167,104-sf of parking for 374 vehicles. |
Midtown Tampa Tampa, FL |
Bromley / Crescent Communities / CASTO | Completed 2021 |
A total of 19-acres, WDG’s scope is 390 residential units, 9,000-sf amenity space, 100,000-sf retail including a Whole Foods with an 850-car parking garage above the grocer. |
National Harbor National Harbor, MD |
The Peterson Companies | Completed January 2010 |
WDG designed a total of 5.5-acres, including an 8-story residential building with 253 units, an 11-story residential building with 182 units, a 184-key hotel, 246-key time share resort, and a total of 80,000-sf of retail space. |
North Hills Master Plan Raleigh, NC |
Kane Realty Corporation | Plan Completed 2013 |
2.75 million-sf, mixed-use development including 989,884-sf office, 45,000-sf retail, a 150,000-sf hotel and 1,565,000-sf residential. Scope includes the development of a master-planned community responsive to existing land use with an urban plaza and open spaces. |
Pentagon Centre Arlington, VA |
Kimco Realty | In Progress |
3-phase master planning site totaling 1,962,600-sf with 705,700-sf office, 346,600-sf retail, 693 units and 2,100 parking spaces. Phase 1 will be 1,068,100-sf mixed-use with 693 residential units, 36,100-sf of new retail and 1,800 total parking spaces. |
Piazza at Tysons Tysons, VA |
Capitol Petroleum Group | In Progress |
Masterplanning of 4.8 acres site located 1/8 mile from Silver Line Spring Hill Station.The site is programmed to accomodate 2M square feet of development of 900,000 sf of residential, 220,000 sf of hotel, 795,000 sf of office, 70,000 of retail area with 2 acres of open urban park. |
Pike & Rose Mixed-Use Rockville, MD |
Federal Realty Investment Trust | Completed |
Master planning of three blocks in a 3,000,000-sf new mixed-use development. |
Rockville Town Square Rockville, MD |
City of Rockville, DANAC, Federal Realty Trust | Completed 2007 |
12-acre, 5- to 6-story mixed-use town center with 644 residential units; 180,000-sf retail; and 1,400 parking spaces in five garages, above- and below-grade. Metal frame over concrete structure, constuction types 1B and 3B. |
Scott's Run South at McLean Station Tysons, VA |
Creative Realty Solutions | In Progress |
Three buildings totaling 1,078,872-sf, 632 residential units, a 102,891-sf, 128-suite, extended stay hotel, 185,000-sf office, and 25,000-sf spa. Site includes 10,000-sf retail and parking for 1,367 cars. |
Spring Hill Station Tysons, VA |
The Georgelas Group | Plan Completed 2011 |
32 acre mixed-use master plan providing for 7.5 million square feet of uses, including 2 to 3.5 million-sf of office space, 2.1 to 5.1 million-sf of multifamily residential, over 180,000-gsf of ground level retail and as much as 770,000-gsf of hospitality uses. |
Sursum Corda Washington, DC |
Toll Brothers | In Construction |
Two-phase redevelopment totaling 1,300,000-sf with 1,131 residential units, 44,000-sf of retail, community center and 979 parking spaces in a below-grade garage. |
The Commons Tysons, VA |
LCOR | Plan Completed 2012 |
Master planning for a 20-acre site at the future Tysons-McLean Metro Station. Seven buildings 7 to 23 stories with 2,571 units, 50,000-sf retail, and 3,100 parking spaces in three levels below grade and podiums. Final design of Building 1, a 13-story, 330-unit multifamily building, is in progress. |
The Manor at Thanh Hoa Thanh Hoa, Vietnam |
Bitexco | Plan Completed 2010 |
Large master planned community on 30,841 m2 (7.61 acres) with 1450 d.u. in four 36-story, high-rise towers, 50 townhomes, 50,000-sf of office space and a large, central, and amenity-rich outdoor space. |
The Monarch Tysons, VA |
Renaissance Centro | In Construction |
203,600-sf, 24-story residential building with 125 luxury condominiums, 6000-sf retail and parking for 250 cars. |
The Spire Master Plan Dallas, TX |
Spire Realty Group | In Progress |
Master plan development with 77,000-sf of retail, 1,277,000-sf of office, 280 residential units, and 600 hotel keys on 11.3 acres. |
Tokyo Olympic Village Tokyo, Japan |
Young Architects Forum | Plan Completed 2011 |
16,000-bed community for the Tokyo Olympics and Paralympics. |
Tysons Transit Oriented Developments Tysons, VA |
Various | In Progress |
Planning for over 25 million-sf of mixed-use development on 110+ acres. |
Water Street Irving, TX |
Gables Residential | In Progress |
As part of a master development, 2 residential buildings with 316 residential units and 20,000-sf of retail and restaurant spaces. Site also includes 40,000-sf of stand-alone retail and restaurant building space. Type 3A and 5A wood frame construction residential buildings, type 1A retail buildings and parking garage. |
3-phase master planning site totaling 1,962,600-sf with 705,700-sf office, 346,600-sf retail, 693 units and 2,100 parking spaces. Phase 1 will be 1,068,100-sf mixed-use with 693 residential units, 36,100-sf of new retail and 1,800 total parking spaces.
Description
Phase 1
Building A - The Witmer
446,400-sf, 25-story, 440-unit residential with 11,400-sf of ground floor retail, and 6 levels of parking for 396 cars.
Building B
Facade refresh to existing big box retail including Nordstrom Rack and Best Buy.
Building C
287,500-sf, 10-story, 253-unit residential with 15,800-sf of retail and 2 levels of parking for 253 cars.
Building D
6,400-sf parking garage with retail. Includes 4 levels of parking for 426 cars.
Phase 2
Building A1
Addition to Building A, including 2-story, 11,000-sf of added retail.
Building B
225,000-sf, 7-story office with 96,000-sf retail and parking for 329 cars.
Building B1
310,200-sf, 10-story office with 34,700-sf retail and parking for 343 spaces.
Phase 3
Building D
223,700-sf, 6-story hotel with 200 keys and 20,700-sf retail.
Building E
422,200-sf, 14-story office, with 121,000-sf retail and parking for 518 spaces.
Building F
36,000-sf, 2-story retail.